Michigan homeowner planning library
Start with the work.
Leave with a plan.
Pick one project. HomeScope connects the early cost, local permit questions, scope decisions, and bid details you need before work begins.
Find my project16 project guides
What are you planning to change?
Choose the closest match. Every guide starts blank. Add your city, size, and scope when you are ready.
Buying & inspecting
Prepare for a property inspection, understand its limits, and turn the report into prioritized decisions.
Home inspection checklist
↗Prepare for inspection day, identify specialty checks, organize report findings, and turn material issues into next actions.
- Inspection day
- Specialists
- Next steps
Specialty home inspections
↗Decide when radon, sewer, well, septic, chimney, environmental, structural, or trade-specific evaluation may matter.
- Property risks
- Specialists
- Questions
Inspection report priorities
↗Sort a long inspection report into urgent risks, costly unknowns, near-term repairs, maintenance, and cosmetic items.
- Urgent findings
- Repair questions
- Next steps
Exterior & property
Projects exposed to weather, property-line, drainage, or exterior-envelope decisions.
Roof replacement
↗See a first-pass cost for your roof, then compare tear-off, decking repairs, flashing, ventilation, roofing system, cleanup, warranty, permits, and inspections.
- Cost
- Permits
- Bids
Fence
↗Estimate a Michigan fence project and organize the property-line, material, gate, permit, and contractor details that should be settled before installation.
- Cost
- Permits
- Bids
Siding replacement
↗Estimate Michigan siding replacement by exterior wall area, then plan removal, concealed repairs, insulation, flashing, trim, permits, and warranties before comparing bids.
- Cost
- Permits
- Bids
Window replacement
↗See a first-pass cost for your replacement windows. Then compare insert and full-frame bids, including the window product, flashing, trim, repairs, permits, and warranty.
- Cost
- Permits
- Bids
Deck
↗Estimate a Michigan deck budget, define the structure and finish system, confirm the local approval path, and compare complete bids before construction begins.
- Cost
- Permits
- Bids
New or changed space
Projects that add square footage, change structure, or create newly finished living space.
Detached garage
↗Plan a detached garage from site work through final inspection, with an adjustable cost range and a checklist for design, zoning, utilities, and complete bids.
- Cost
- Permits
- Bids
Home addition
↗See a first-pass cost for your addition, then identify the design, foundation, utility, permit, and finish choices every contractor should price.
- Cost
- Permits
- Bids
Basement finishing
↗See a first-pass cost for finishing your basement, then check moisture, emergency escape, insulation, utilities, bathroom work, permits, and finishes before requesting bids.
- Cost
- Permits
- Bids
Load-bearing wall
↗Coordinate structural verification, engineering, permits, trades, inspections, and complete bids.
- Cost
- Permits
- Bids
Interior remodeling & hiring
Room-level work and contractor decisions where selections, allowances, payments, and complete scope matter.
Kitchen remodeling
↗See a first-pass cost for your kitchen, then compare layout changes, cabinets, counters, appliances, trade work, permits, allowances, and schedule.
- Cost
- Permits
- Bids
Kitchen remodel timeline
↗Sequence planning, permits, ordering, construction, inspections, temporary-kitchen needs, and closeout.
- Cost
- Permits
- Bids
Bathroom remodel timeline
↗Sequence planning, permits, rough trades, waterproofing, finishes, inspections, household shutdown, and closeout.
- Cost
- Permits
- Bids
Compare contractor bids
↗Normalize scope, allowances, exclusions, payments, permits, changes, warranty, and closeout before choosing.
- Cost
- Permits
- Bids
Michigan Roof Replacement
Follow one connected path through likely costs, municipal permit questions, roofing systems, contractor interviews, quote comparison, and final-payment checks.
Compare the work, not just the totals.
Put 2–4 bids side by side and check scope, materials, allowances, exclusions, warranties, and payment terms.
Useful estimates need clear assumptions.
Every calculator gives you a planning range, not a quote. Final pricing depends on the work, existing conditions, selections, labor, design, permits, and written bids. Municipal links are starting points, so confirm current requirements before work begins.