First-time site tour

One project.
Six useful decisions.

HomeScope helps Michigan homeowners move from an early cost question to official permit research, a shared project description, comparable bids, and records worth keeping—with no contractor lead form in the middle.

No account requiredOfficial-source handoffsReusable homeowner records
THE FAST ANSWER

Estimate. Verify. Write. Compare. Decide. Keep.

You do not need to use every page. Enter at the decision you are making now, carry the same project context forward, and leave each step with a clearer number, source, question, or written record.

Choose your entry point

Where are you right now?

01

I have only an idea

Begin with Home Remodel 101, then choose a project guide when the result is clear enough to estimate.

Start at the beginning
02

I already have an estimate

Read the proposal line by line before treating the total as complete or comparable.

Read my estimate
03

I am checking permits

Go directly to official city or township sources. HomeScope will not invent a local requirement.

Find my local permit office
04

I am collecting bids

Create one shared description, check each bid, and compare the same work side by side.

Compare written bids

The HomeScope route

Follow the project—not the menu.

Each step produces something useful for the next one. Skip steps that do not apply, but preserve the facts you have already verified.

01

Estimate

Start with an educational planning range. Change the community, project size, and relevant assumptions so the example reflects the project you are considering.

Find my project guide
02

Verify locally

Open the directory to find the city, township, or agency that handles permits for the address. Record the official link, your questions, and the review date instead of borrowing an answer from a nearby community.

Find official permit sources
03

Describe one job

Turn the desired result, boundaries, assumptions, products, exclusions, and open questions into one description you can send to every bidder.

Write my project description
04

Review written bids

Check whether each proposal identifies the same work. Then compare totals only after scope, allowances, exclusions, payments, warranty, and change rules are visible.

Check one written bid
05

Pressure-test the agreement

Review payment stages, allowances, contingency, signing questions, and change orders before an unclear term becomes a project dispute.

Open planning tools
06

Keep one return point

Use My Project Records to move between the same project decisions without rebuilding the basic context. Print or save the records that should leave the website with you.

Open My Project Records

Context that travels

Enter the basics once. Check them everywhere.

When a contextual link includes a community, project, and quantity, HomeScope can carry those planning inputs into connected tools. Always confirm the destination before acting: a carried value is still a planning input, not an official municipal fact.

Know what HomeScope can do

Planning help without false certainty.

HOMESCOPE CAN

Organize the decision

Show assumptions, do educational math, link official sources, point out missing details, and create reusable planning records.

YOU STILL VERIFY

The project facts

Actual site conditions, product selections, contractor proposals, local permit requirements, and the final signed agreement.

PROFESSIONALS DECIDE

Work outside a planning tool

Design, engineering, inspection, moisture diagnosis, code interpretation, legal rights, tax treatment, and other licensed or professional determinations.

Start with the real project

Give the project one reusable return point.

Keep the community, project, and quantity together as you move through estimates, official sources, scopes, and bids.