Skip to guide content

Oakland County homeowner guide

Farmington Hills Building Division permits, BS&A & inspections

Use Farmington Hills’ fully online BS&A workflow for applications, attachments, payments, stamped documents, inspections, and permit history.

Local guide reviewed September 10, 2026Official sources checked September 10, 2026Planning estimates - not quotes
Official pages reviewed: September 10, 2026We reviewed the linked municipal pages on this date. Requirements can change; always reconfirm the exact address and scope before work begins.
See official sources ↓See review history →

Direct local answer

Farmington Hills building permits and inspections start online.

The Farmington Hills Building Division at 248-871-2450 is the city office for building-permit questions. Building-permit applications, supporting documents, processed-invoice payments, stamped plans, and inspection requests use the city's BS&A Online record.

Questions248-871-2450
Apply & inspectFarmington Hills BS&A ↗
Office31555 W. Eleven Mile Road
Applications & inspections

Farmington Hills BS&A Online

Create or link an account, choose the property and permit type, upload the city-listed documents, then manage the permit and inspection record online.

Open the official online portal ↗

Official department, BS&A, and jurisdiction pages reviewed September 10, 2026. Requirements depend on the exact address and scope; verify the current application, documents, fees, and inspection sequence with the responsible city before work begins.

One connected homeowner record

A rough idea becomes a decision-ready plan.

  1. 01PriceEstimateBuild an editable local addition range and see every planning assumption.Open this step
  2. 02ConfirmVerify locallyPrepare the questions, documents, and inspection call for the municipality.Open this step
  3. 03DefineWrite one scopeGive every bidder the same project description, quantity, and expectations.Open this step
  4. 04DecideCompare bidsCheck allowances, exclusions, milestones, and closeout records side by side.Open this step
  5. 05PreserveKeep the planOpen browser-local Project Records and keep the same place, project, and quantity without an account.Open this step
Important

The calculator gives you a planning range - not a quote. Current written bids and the local office that handles permits for the exact address remain the final decision sources.

City-adjusted calculator

Start with a working range.

Choose your projectNo project assumed

Select a project only when you want a local planning range. Permit and building-department visitors can continue without choosing one.

Local adjustments are broad planning assumptions, not measured city price indexes. Obtain several written bids and confirm current permit fees and requirements directly.

Verified local details

What Farmington Hills homeowners should know.

01

Applications and inspections are online

Beginning in March 2026, the city moved building-permit applications and inspection requests exclusively to its BS&A portal.

Official transition notice ↗
02

The portal accepts supporting documents

Applicants select the property and permit type, describe the work, estimate fees, and upload plans or images when the permit type allows or requires them.

Building instructions ↗
03

Homeowner applications require an affidavit

The city’s homeowner instructions require a signed and notarized Homeowner Affidavit with each homeowner permit application.

Homeowner instructions ↗
04

Stamped plans live in the record

The Building page explains that approved stamped documents are downloaded from the permit’s Documents or Attachments area in BS&A.

Permit printing guidance ↗

Farmington Hills building department

Start with your local permit office, then confirm every required inspection.

Farmington Hills Building Division is the official starting point identified in our current source review. HomeScope links to the responsible municipal pages below; the department - not this guide - determines the current requirements for an address and project.

Responsible office

Farmington Hills Building Division

31555 W. Eleven Mile Road · 248-871-2450

Online starting point

Farmington Hills BS&A Online

Since March 2026, building-permit applications and inspection requests are submitted online through the city’s BS&A portal.

Open official application path ↗
Step 01

Choose the right application path

Match the exact project scope to the municipality’s current procedure and forms.

  1. Create or link the BS&A account to the city record.
  2. Select the property, permit type, work description, applicant contacts, and fee quantities.
  3. Upload the attachments required for that permit type.
  4. Monitor the record, pay the processed invoice, download stamped documents, and schedule inspections online.
Step 02

Plan inspections before work starts

Know which checkpoints must happen before concrete or finished surfaces conceal the work.

  • The city moved building inspection requests to BS&A Online in March 2026.
  • Request the inspection from the permit record and keep the permit number and job location available.
  • Do not conceal work that requires inspection; retain the approved permit record and stamped documents.
Step 03

Assemble the submission package

Prepare the project information the official procedure identifies for your scope.

  • Completed permit application
  • Scaled plans or images when required for the permit type
  • Signed and notarized homeowner affidavit for homeowner applications
  • Applicable site, energy, drainage, soil-erosion, tree, or trade documents explicitly listed for the scope

Local workflow

A practical sequence for Farmington Hills.

01

Create and link the account

Connect the homeowner or contractor record to Farmington Hills in BS&A.

02

Build the attachment set

Use the city’s building, planning, and engineering forms for the exact scope.

03

Submit and pay online

Monitor application status, invoice, corrections, and stamped documents.

04

Inspect and archive

Request inspections from the record and keep approvals with the home file.

Visit Farmington Hills Building Division ↗

Project checkpoints

Questions change with the scope.

Roof replacement

Check the city’s Roofing Certification and confirm the permit, product, decking, inspection, and final-record path.

Addition or new home

Coordinate scaled plans, site plan, energy, drainage, soil erosion, tree, water, building, and trade documents as applicable.

Kitchen or basement

Separate building and trade permits and identify rough inspections before concealment.

Fence or site work

Use the listed fence, planning, engineering, drainage, and tree forms where the scope triggers them.

Contractor-ready

Put these questions in every bid request.

  • Who owns the BS&A record?
  • Which attachments are included?
  • Is the homeowner affidavit required?
  • Who downloads and prints stamped plans?
  • Which inspection and final records are delivered?
Compare contractor bids →

Primary sources

Verify directly with Farmington Hills.

Report a broken link or local change →

Use the local record

How to plan a home project in Farmington Hills without losing the local details.

This guide connects an early project range to the municipal starting point. It does not replace the official determination for an address, a complete design, or a contractor’s written scope.

01

Confirm the jurisdiction

Verify that the property is governed by Farmington Hills before choosing forms or scheduling an inspection. Postal city names, school districts, neighboring townships, and county services do not always identify the enforcing authority.

02

Describe the exact work

Tell Farmington Hills Building Division what is changing, where it is located, which trades are affected, and whether structural, utility, zoning, or site work is involved. A project label alone is rarely enough to establish the correct path.

03

Plan inspections before concealment

Ask which approvals must occur before concrete, insulation, drywall, roofing, finishes, or other work covers the installation. Put inspection responsibility and correction responsibility into the contractor’s written scope.

04

Keep the final record

Store applications, drawings, issued permits, inspection results, approved changes, warranties, manuals, receipts, and final approvals with the home. Recheck official sources if the scope or schedule changes.

Official source first

Municipal requirements change. Verify the current path before starting work.